Dynamine performs economic analysis of the whole project (block model, mining cost, production costs, recovery and sale price), thus generating optimized pits.

​

The block model is developed from boreholes, geological and geotechnical interpretation. Later, with the economic information (production and selling costs), the economic optimization of the deposit is made.

​

With the optimized surface, final pits and pushbacks are created. Finally, long, medium and short term sequencing. 

​

The fleet sizing (loading, hauling, drilling, etc.) is carried out considering the production parameters, technical and economic data, thus ensuring the best NPV of the project. 

​

Lease studies, design and sequencing of waste dumps are performed.

​

​

​